01
Perimeter Fencing
Neighborhood and property perimeters built to one consistent standard.


HOA common areas, neighborhood perimeters, commercial lots and equipment enclosures. City permits and HOA covenants are separate approvals, and we build to both.
01
Neighborhood and property perimeters built to one consistent standard.
02
Fencing for pools, amenity areas and equipment pads.
03
Gates planned around foot traffic, vehicles and maintenance access.
We walk your fence line with you, measure, and check your city and HOA requirements.
Wade Hicks, our Program Manager, prepares your price and goes over your options with you.
We pull the city permit and give you the fence details your HOA asks for.
Our crew installs your fence on heavy-duty galvanized steel posts.
We measure your yard, check your city and HOA requirements, and send you a price.
I received three independent quotes. The effort S&B Fencing put into their bid was remarkable.
Joseph D.
Google review
Wade and his crew are amazing! They went above and beyond to get our fence completed. They had to troubleshoot several issues including the uneven sloping of the driveway.
Deanna P.
Google review
I recently had S&B Fencing replace the wrought iron fence in my backyard, and I couldn't be happier with how everything turned out. From start to finish, the whole process was smooth and professional.
Dave M.
Google review
Can't find your answer?
Monday to Friday, 9 am to 5 pm
Yes. We build fencing for commercial lots, HOA common areas and neighborhood perimeters.
Your HOA's architectural or design review committee, under its own covenants. That approval is separate from any city permit.Read the source
City requirements and HOA covenants are separate checks. Trophy Club explicitly states permit approval does not exempt HOA requirements.Read the source
We give you the fence details your HOA asks for (style, height, materials and layout). The homeowner completes and submits the application.Read the source
For HOAs with more than 40 lots, §209.00505 requires reasons and changes needed, and lets an owner request a board hearing within 30 days.Read the source
We price every project after a free on-site consultation, because length, height, gates and the ground all change the number.

Tell us about your project for a free, no-obligation estimate. We'll come out, measure and walk you through your options.